There is some changes to the project, there will be :
1) A login page for admin (noted,cashier and chef do not require to login)
2) After admin has login, will be directed to the admin page with function to
i) edit the customer's special order page, either to disable or enable a dish.
ii) insert the unique number from the RFID tags into database
iii) set and edit the price for every RFID tags in database.
Tuesday, August 3, 2010
Wednesday, July 21, 2010
First meeting with Ms. Hazinah on last Tuesday 13 July 2010
Ms wanted to know the progress of the project. Currently doing the user interface for the "customer main menu", "customer special order menu", "cashier main menu" and " chef main menu". Told by Ms that every systems must have admin page for user to control the system at ease. However, the plan for the admin role is control by the cashier, stated earlier in PSM 1.
Building the user interface using dynamic HTML rather than using VB.Net.
Building the user interface using dynamic HTML rather than using VB.Net.
Sunday, September 6, 2009
Doing chapter 4 6/Sep/2009
Use case and sequence diagram were done (but not very complete though)
Questionnaire for survey has been corrected as well
Still planning for system architecture, database design (not sure if my system need this for RFID), class diagram, and menu interfaces.
Questionnaire for survey has been corrected as well
Still planning for system architecture, database design (not sure if my system need this for RFID), class diagram, and menu interfaces.
Meeting 3/Sep/2009
Chapter 2 and 3 Submitted to Ms. Hazinah
Questionnaire has been checked by Ms. Hazinah
Questionnaire has been checked by Ms. Hazinah
Thursday, August 27, 2009
3rd Meeting on 20th Aug 2009
1) I've done my presentation to Ms. Hazinah and my fellow friends...
2) Guidance on what should be prepared/have in chapter 1 - 5
3) Chapter 1 wrong format.
4) Chapter 2 - some mistake on comparison between current system and similar system.
5) Thinking some questions to be asked in a survey.
6) Finally, permission to write reports in English, require Ms. Hazinah confirmation and signature to proceed with the application.
2) Guidance on what should be prepared/have in chapter 1 - 5
3) Chapter 1 wrong format.
4) Chapter 2 - some mistake on comparison between current system and similar system.
5) Thinking some questions to be asked in a survey.
6) Finally, permission to write reports in English, require Ms. Hazinah confirmation and signature to proceed with the application.
2nd Meeting on 13 Aug 2009
Presentation suppose to be today but due to running out of time, my presentation will be on 20th of Aug 2009...
Thursday, August 6, 2009
First Meeting with supervisor
Today i only found out...
I submit chapter 1 to the wrong person. @_@ Dang...
Where is Encik Othmawi...???
Well today we discuss about chapter 2 & 3
New tasks : 1) Gantt Chart (PSM 1 & 2)
2) Chapter 2(Study existing & similar system and comparison between similar system)
3) Chapter 3
Next Thursday on 13 Aug 2009
-A project presentation at 9.30am
-Submit chapter 1, 2, and 3
Arghh so many task...@_@"
I submit chapter 1 to the wrong person. @_@ Dang...
Where is Encik Othmawi...???
Well today we discuss about chapter 2 & 3
New tasks : 1) Gantt Chart (PSM 1 & 2)
2) Chapter 2(Study existing & similar system and comparison between similar system)
3) Chapter 3
Next Thursday on 13 Aug 2009
-A project presentation at 9.30am
-Submit chapter 1, 2, and 3
Arghh so many task...@_@"